The plan ignores the blueprint.
The whiteboard says the batch runs Tuesday. It does not know the mixer is booked, the raw material is not released, or an exhibit batch is still on the line.
• Manufacturing Execution System
Plan on your product and control masters, run every batch on an enforced EBR, prove new formulations on exhibit orders before they scale, and see yield, OEE and planned versus actual for every run.
Runs on its own. Connects when you’re ready.
A plan the floor can run.
Schedule against capacity, released material and equipment readiness.
The problem
By the time QA reads it, the step was skipped, the machine was out of calibration and the batch is already in the bin. Review becomes the place mistakes are found, not the place they are prevented.
The whiteboard says the batch runs Tuesday. It does not know the mixer is booked, the raw material is not released, or an exhibit batch is still on the line.
The same binder problem returns every month. The investigation begins with a blank form because nobody can see the last occurrence and its closed fix.
Finished product sits in quarantine while QA chases missing entries and rebuilds the story. Deviations stretch release by days, sometimes weeks.
From plan to finished batch
01 / Capacity planning on product and control masters
Your product and control masters define every stage of the batch. Factro builds plans from sales orders and checks each stage against real capacity before release.
Build plans from sales orders, pinned to the approved master version.
See rooms and equipment booked twice, before the plan is released.
Check shortages and lead times against every stage of the plan.
02 / Execution that enforces itself
The EBR runs the batch step by step, and every gate is part of execution. The system holds the work instead of asking someone to remember a rule.
Enforce step order, peer verification and minimum and maximum time, with a signed line clearance on every changeover.
Run IPQC at the stage it gates, and FPT before the batch leaves the floor.
Block equipment overdue for calibration or cleaning. With QMS connected, assign tasks only to operators trained on the current SOP.
03 / Exhibit orders for formulations
Development batches run on their own orders and record. Each trial runs like a real batch, and a formulation is proven only by three passing trials in a row.
Run trials with a timer, stages in order and the same stage window as work orders.
Any failed trial resets the count, so proof means three passes in a row.
Head QA and Head R&D approve jointly, and the formulation moves into the Library.
04 / Deviation history & genealogy
A new deviation arrives with the history for the same equipment, product and stage, and the genealogy of the lots involved. Your team starts from evidence.
See past occurrences and how each was resolved, beside the open deviation.
Trace the material lots behind the batch, and the batches that share them.
Keep the investigation, actions and release evidence on one record.
05 / Yield, OEE & planned vs actual
Every run records planned versus actual quantity, time and yield, stage by stage, and every machine feeds OEE. No spreadsheet needed.
Break yield down by batch, product and stage.
Compare planned and actual quantity, time and yield for every run.
Track OEE for every machine from runtime, downtime and output.
Under the hood
Planning, execution, equipment and exhibit orders, all on the batch record.
Plans from sales orders, checked against material and capacity.
Approved plans, run step by step on the electronic batch record.
Work centres and equipment, with runtime, calibration and cleaning.
Formulation trials, proven by three passing runs in a row.
Controls for each regulated category, on the same records and workflows.
Moments that matter
Five situations every plant meets. Here is what happens in Factro.
The planner builds it from the sales order and sees every stage against actual work centre and material readiness. The clash is visible before the customer gets a promise.
The next batch cannot run until the clearance is signed. The record knows who cleaned it and when, on the changeover before its first step.
The successful-run counter resets. The formulation stays in trials until three consecutive runs pass, and the joint QA and R&D approval is on the record.
The next stage stays held. The deviation opens with the stage, readings and history already attached, so QA starts from facts instead of a phone call.
Planned versus actual by stage shows where it went. Production traces it back to a machine, shift or material lot without reconstructing the run.
Who it is for
Each role opens Factro on its own screen, with the evidence it needs to act.
01 / Who it is for
Plans from sales orders, with real capacity and shortage checks before release.
Plans from sales orders on the approved masters
Clashes and shortages caught before release
Exhibit and commercial work on one plan
02 / Who it is for
Run the shift without chasing signatures.
Open IPQC checks and pending sign-offs
Competency checked before every assignment
A handover with the whole batch history
03 / Who it is for
The right lot and quantity, independently verified.
Released material only
Checked quantities and weighing tolerances
Second-person verification before the batch moves
04 / Who it is for
The approved instruction at the step you are on.
Stage order and time windows enforced
Current SOP from QMS, and equipment standing
Readings recorded directly against the batch
05 / Who it is for
Prove the process before the production run.
Dedicated exhibit orders
Three successful consecutive trials
Joint QA and R&D approval
06 / Who it is for
Review the trial evidence, not a summary spreadsheet.
Formulation versions on the record
Trial results and deviations together
Approved masters move into the Library
07 / Who it is for
See the losses and the delays while there is time to act.
OEE by machine and line
Planned versus actual for every stage
Yield and delay trends with source records
Before you start
Start with the operation you have. Agree the controls and connections you need.
Talk to our teamA separate order for trials and development batches of new formulations. It runs on the same floor and capacity plan as commercial work, but keeps its own record and approvals.
A work order is pinned to its approved master version. A later revision applies to future batches; the record of what the operator actually followed remains intact.
Not with the controls on. Line clearance is mandatory on changeover, IPQC checks gate the relevant stage, FPT must pass before the batch can go to release, and training and equipment standing are checked before the work starts.
No. Assignment checks the competency matrix. A task only goes to people trained on its current SOP.
It is generated from your approved master and completed as work happens. Operators record readings and signatures at the step, rather than assembling a separate record at the end.
When you start using it. Your team works with its own masters and batches during onboarding, before the subscription begins.
Make it your workflow
Walk through your planning, people and equipment with our team. See the plan against your blueprint, the gates hold, and a deviation arrive with its history and genealogy.