eBMR and eBPR execution
Dispensing requires second-person verification, and line clearance blocks the next stage until the previous one is closed.
• Pharmaceuticals
Quality works as a gate, not a review after the fact. Evidence sits on the record it belongs to, so the audit pack is a download, not a project.
Supported frameworks, not certifications. Regulatory updates included.
Why now
No turnover band has a grace period left. What used to be prepared before an audit now has to exist every day.
A pharmaceutical quality system, quality risk management, product quality review, lifecycle validation, computerised system controls and data integrity.
Assembled the week before an inspection, they show that work produced as the batch runs is missing.
These controls run on the Compliance Engine, the one every Factro pack uses.
What is tailored
Where the Pharmaceuticals pack changes how the core behaves.
Dispensing requires second-person verification, and line clearance blocks the next stage until the previous one is closed.
In-process results attach to the stage that produced them, with out-of-specification and out-of-trend investigation routed automatically.
Quarantined material is structurally refused at the point of dispensing — the control is the system, not a label on a drum.
Calibration blocks the stage the moment it lapses, instead of surfacing weeks later as a batch-level finding.
Built for pharmaceuticals
These features switch on with the pharmaceuticals pack. They sit on the same ERP, MES and QMS every Factro plant runs.
01 / Inventory · Assay-adjusted dispensing
Assay and LOD are recorded against each API lot at receipt. Dispensing recalculates the quantity to deliver the labelled amount of active, and the balance holds the tolerance for an API. Nobody reaches for a calculator on the floor.
The assay and LOD recorded at receipt set the quantity to weigh, with the calculation shown on the step.
A quarantined lot is refused at the point of dispensing. The control is the system, not a label on a drum.
The balance records only inside the tolerance, and a second person verifies the weighing before the next stage opens.
02 / Library · MPCR and MFR
Master production and control records and master formula records are versioned under change control. Every work order is pinned to the approved version, from BOM and dispensing through IPQC, packing and finished-product testing.
Each MPCR and MFR is revised under change control, and only the approved revision can be issued to a work order.
A work order keeps the revision, BOMs and batch documents it was issued with. A later revision applies to future batches only.
BOM, weighing and dispensing, MBR, IPQC, MPR and FPT sit together, so nobody plans from a stale copy.
03 / Production · eBMR and eBPR
Batch manufacturing and packing records are completed at the step, with readings, signatures and deviations. The printed BMR carries the fields an inspector reviews first, without a second copy to reconcile.
Quantities, lots, readings and signatures are entered as each step is done, not copied up at the end of the shift.
A reading outside its limit raises a deviation on that step, with the stage and the reading already attached.
QA sees missing entries before final review and reads the exceptions. The printed BMR comes from the same record.
04 / Sales and purchase · Drug licence checks
Customer and vendor drug licences sit on the account with their validity dates. A sales order or PO against a lapsed licence is refused, and the renewal shows up as work before it lapses.
Each customer and vendor keeps its drug licences, numbers and validity dates on its own record.
A renewal task opens 60 days before a licence expires, with an owner and the request sent.
Confirmation checks the licence alongside credit and stock. A lapsed licence stops the order, whoever raises it.
Schedule M, continuously
Each continuous obligation in Revised Schedule M, and the records in Factro that answer it.
SOP governance, deviations routed into CAPA, self-inspection and APQR.
A risk register with FMEA scoring, linked to the process steps it covers.
The annual product quality review assembled from batch records, not rebuilt by hand.
URS, IQ, OQ and PQ traceability matrices on validation-ready workflows.
Field-level access, re-authenticated approvals and backups with point-in-time recovery.
ALCOA+ across records, on an append-only, hash-chained audit trail.
Controls
Every control below runs on the Compliance Engine. The same record carries the evidence across the plant.
Append-only, hash-chained audit trail capturing old value, new value, author, time and reason
Immutable records, secure archives and no hard delete of GxP data
Re-authenticated approvals capturing the approver, time and meaning on every sign-off
Role-based access control, down to the individual field
Segregation of duties enforced in the system, maker is never checker
Linked-record architecture carrying full data lineage end to end
Electronic batch records across MFR, BMR and BPR
Approval workflows with role-based, re-authenticated sign-off
Production planning with batch, lot and vendor qualification traceability throughout
Validation-ready workflows with URS, IQ, OQ, PQ traceability matrices
Audit-ready exports in inspector-readable form, on demand
ALCOA+ data integrity enforced across every record, attributable through to available
Automated redundant backup with point-in-time disaster recovery
Regulatory change
The Compliance Engine tracks the rules that apply to you, works out what a change touches, updates the system and re-validates before release. You file no change request.
FDA set the criteria for trustworthy electronic records and signatures. Audit trails, signature meaning and access controls in the pack map to it.
India’s revised GMP schedule was published, with phased deadlines by turnover band. The pack’s quality risk management and computerised system controls track its clauses.
Facility segregation, quality risk management and computerised systems controls were built into the rule set and validated before the phased deadlines landed, not after.
No grace period across every turnover band, with state drug controllers reporting inspections monthly to CDSCO.
Chapter 4 on documentation and Annex 11 on computerised systems, alongside a new Annex 22 on artificial intelligence. Public consultation closed in October 2025, and the pack follows the revisions into the product as they land.
Validation readiness
Available on the Dedicated tier, mapped to your workflows. URS, IQ, OQ, PQ, RTM and GAMP 5.
Certification in progress. Encryption, access control and backups are described on Security & Trust.
The Compliance Engine scores inspection readiness continuously, with guidance on each open gap.
Make it your workflow
Bring the regulation that keeps you up at night. We will show you the control that answers it, on a batch from your plant.